But now i have made a start on my pier.

The Pier head adaptor is all sorted as is the 7ft section of Gas pipe.Its just the 2x2x3ft hole i have to dig :D.The first foot was okay but now i am through the topsoil and into a mixture of builders rubble and Clay.

All i can say is i am doing 6 inches at a time :shock:

And i can deffinatly say i am not going to be hand mixing the concrete later on but hiring a mixer ,i recon the £15 to hire a mixer will be the best £15 i am going to spend :lol:

Anyhoo back to another 6 inches........I may be some time !!

Link to comment
Share on other sites

  • Replies 34
  • Created
  • Last Reply

If it gets too bad you could look at hiring a kango. This would make easy work of the harder stuff you have to dig through.

I thought that the recomended minimum was 3' x 3' x 3' ?

Good Luck

Ant

Link to comment
Share on other sites

I thought that the recomended minimum was 3' x 3' x 3' ?

Dont tell me that now :D

I recon that 9 inches of concrete either side of the pipe 36 inches down and the pipe filled with concrete should be stable enough for a 4 foot pier.

Tell me now if i am wrong please :?

Link to comment
Share on other sites

I thought that the recomended minimum was 3' x 3' x 3' ?

Dont tell me that now :D

I recon that 9 inches of concrete either side of the pipe 36 inches down and the pipe filled with concrete should be stable enough for a 4 foot pier.

Tell me now if i am wrong please :?

In all the holes that I've read about for a pier have always been 3 x 3 x 3. This may well be over board, I don't know - I've never built one.

But that's what I've heard.

Sorry Ant

Link to comment
Share on other sites

Ours is 2x2x2 and isn't going anywhere! We used quite a strong concrete mix too (apparently?) so maybe that helps?

We had the same problems, after about a foot and a half, our garden turns to clay...

Best of luck mate! Remember to take lots of piccies :D

Link to comment
Share on other sites

hmmmm, not sure exactly but around 5 foot in order to clear the sides of the shed, its an rsj though so I'm a bit concerned about vibration but we have a few plan B's if thats an issue :D

Link to comment
Share on other sites

Steve,

I Have a kango if you want to borrow it..Pick it up Friday and drop it back at the kelling Sp..In September..

Could end up being the Stargazers Pier making Kango thing.. :D

Link to comment
Share on other sites

If i could get out of this hole i might of taken you up on it Greg :lol::p:lol:

I am calling it a day at 2ft 6 deep :clouds2: i recon a concrete plug this big will be perfectly adequate (i will just cut 6 inches off the pipe)

I am please of a mornings work as i have the easy bit to do now.

The only problem is all the soil i have created,i recon i am going to have to recreate the scene from the Great Escape around my friends and family :):lol:

You dont fancy some do you Greg :D

Link to comment
Share on other sites

Some piccies

First the Pier insitue

771_thumbnail.jpeg

(click to enlarge)

Next the hole awaiting concrete

772_thumbnail.jpeg

(click to enlarge)

And finally the Pier head adaptor waiting to be concreted into the tube

773_thumbnail.jpeg

(click to enlarge)

Link to comment
Share on other sites

That looks the business!!

That pier head looks awesome, how does the mount physically attach to it? Obviously it sits in the big hole, but how is it held down?

For mine, we've had to craft an elaborate block that bolts to the mount head (with recessed holes at different widths to account for the steps on the mount and a bolt to go through the center) and to the pier...

Link to comment
Share on other sites

Nice! Is it for a HEQ5? Because my EQ6 is an M12 bolt... I'll take a picture of what we've got at some point, its completely DIY so looks a bit dodgy but should work, its also made out of a big chunk of wood for the time-being, but will eventually get machined from aluminum :D

Link to comment
Share on other sites

Heres a few pictures of my pier head adaptor thingy - as I said, it looks a bit rough :D But it works!

774_thumbnail.jpeg

(click to enlarge)

Top View, recessed holes for bolts to go in, locking the wood to the top of the pier, you can also see the locating stud for the mount as well as the various different holes so the mount sits snugly...

775_thumbnail.jpeg

(click to enlarge)

Bottom View, recessed hole in the center for the mount bolt to go through, this ties the mount to the wood then the wood is bolted to the pier.

776_thumbnail.jpeg

(click to enlarge)

Side View, with bolt to show how it connects to the pier.

Hopefully the wood will get replaced with aluminum at some stage but for the time being, it'll work and the wood might even help supress any vibrations on the RSJ...

Link to comment
Share on other sites

Don't get paranoid over the size of the concrete base. IMO, 3'x3'x3' is 'overkill' for the majority of amateur set-ups.

My pier base is an 18" cube, with a 12" cube at the bottom (all 'cast' as one of course). This supports a 6" dia (1/4" Wall) steel tube, 10mm top and bottom plates (welded), another 10mm top-plate (for adjustment), a Meade Superwedge (much modified), a 10" LX200GPS with 'piggy-backed' ED80, and 7kg of counter-balance weights.

No vibration or resonance problems, apart from still having some very minor flexure in the wedge, and been in use for 6 years.

Link to comment
Share on other sites

I did a pier for my HEQ5 Pro a while ago. Your hole is about the same size as mine. Two extra things I did 1. Filled the pipe with concrete ( not quite to the top) 2. Using some wood made a box shape 20 cm X 20cm and length just short of the pier top ( my pipe is slightly smaller dia) put this over the pipe and filled it with concrete - when dry - removed wood. This reduced "ringing" to about zero.

John

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. By using this site, you agree to our Terms of Use.