Jump to content

NLCbanner2024.jpg.2478be509670e60c2d6efd04834b8b47.jpg

Yawning Angel

Members
  • Posts

    859
  • Joined

  • Last visited

  • Days Won

    4

Posts posted by Yawning Angel

  1. 8 hours ago, JamesF said:

    I'm pretty sure the hole goes all the way through rather than being blind

    You could keep it contained in the adapter by drilling out the underside to take the head of an M10 cap head.

    A stainless stud connector on an M10 bolt, for ref:

    IMG_2226.JPG.f4199f1f718fb7c3957118221c3c3957.JPG

  2. On 13/05/2019 at 10:03, Yawning Angel said:

    spur feeding the pier's 240V, but I've not tried getting that down the duct yet...I imagine it's going to take some effort

    The twin and earth is in place - It wasn't too bad to pull except the obs was quite warm after a cloudless day. 

  3. You should find that a Win10 box can be correctly powered off from an RDP session. It still doesn't do WoL natively, but the solarwinds solution is quite robust. There are also fully featured Microsoft RDP client apps on both iOS and Android, along with WoL apps, so you can manage the process from a phone or tablet

    As a side project, it might be worth considering virtualizing the old XP box and running it on fresh hardware - it then becomes a simple thing to backup and restore, along with being pretty hardware agnostic

    • Like 1
  4. A little more work this weekend, when not enjoying the sunshine:

    The desk needed finished, so I took it out, trimmed one edge where it was a little tight and drilled 2 60mm holes for cable access. Then sanded the whole thing (it's 28mm furniture board) and applied beeswax with 0000 grade wire wool. Buffed that after it dried and gave it a second coat with a cloth. Polished that up, job done! I've some table grommets ready to drop in to make it look all posh 🙂 

    The electrickery continued too, I ran the 12V cable out to the pier, which was the first try of the underfloor duct - the draw rope I left in worked, which had been a worry since it was quite thick nylon rope left over from holding the roof tarp on. It did also mean I needed to cut holes in the carpet tile over the duct. The cable is 25 amp rated, 2mm², and will be fed from a Nevada PSW-30 hiding in the warm room. 

    On a cabling roll, I fed a second twin and earth through the trunking back to the box for the spur feeding the pier's 240V, but I've not tried getting that down the duct yet...I imagine it's going to take some effort

    I then moved to networking, and terminated the incoming SWA into patch panel, along with the first 2 network sockets, fed that into it's round place in the comms cabinet, connected it all up and tested - it works! Quite pleased with how well the cabinet fits under the desk too, snug like it was made for it!

    With that working, I connected up the wireless access point and a spare PTZ webcam, connected the LED controller to the WiFi, set up a smart plug on the inspection light's socket and plumbed it all into Amazon Alexa. Resulting in "Alexa, turn on the observatory lights". This makes the IT geek in me smile :icon_geek:

    Desk's-eye view - no, it's not in the final position, just a test 🙂 There'd be more pictures, but for 2 things. 1) Wires wires and more wires isn't very photogenic and 2) I forgot...which is the real reason

    IMG-2224.JPG.0725699f7d5f8c267205d56f62501ebb.JPG

    There is still loads to do, but things are getting ticked off the list. The mountain of bits and pieces I've been tripping over in the house for months is starting to dwindle as they get installed

     

    • Like 1
  5. On 08/05/2019 at 00:47, JamesF said:

    You might have to buy some more kit to fill it up :)

    The universal law will surely apply -  "Stuff expands to fill the available space" ?

    A little more detail: The trunking is 100mm x 50mm with 3 segregated channels inside - top to bottom I'm running Mains, 12V and network. I'm thinking to punch through the wall into the scope room, and extent the trunking a meter with a couple of sockets 'just in case'. They have a great selection at TLC Electrical Supplies

    As I was installing the electrics during the day, I planned on rolling the roof off for daylight, while the power was off. Calamity, the roof wouldn't budge! It seems that my tight tolerances between the wooden roof beams and the V rail had been gobbled up by the natural movement and settling of the wood ? 

    All was not lost, however - as the roof isn't inherently captive, I was easily able to jack it up, add some spacers under the wheel bolts then drop it down. It now glides effortlessly again, panic over!

    Since I was working on the roof, I also installed a drag strap to the inside frame, to save me reaching up to open and close it. Something I'd had sitting in the bits pile since spotting it on eBay in about November!

     

  6. They’ve been up to 40degree in direct sun. Even without sticking them, they didn’t seem appreciable effected. I’m just thinking of them not lifting and becoming an unseen trip hazard ?

    That said, the grab on that tape is quite aggressive, as I found when I tried to lift a carpet tile I’d laid wrong! It can only help

  7. I was intending to change hats after my networking success, and continue sanding and treating shelving, but I really didn’t want to get changed into scruffs!

    Thus I did more techie work, and started the mission control board

    083AE628-2E46-4FD9-97D3-AB9CA820647C.jpeg.2d2baf415f8659580678d4a03700417d.jpeg.c698e58ff91633c480662e75d26edb80.jpeg

     

    12V power distribution block, PC, Dew controller(usb controlled) and PC power brick, 1st draft layout. To this I need to add a USB hub on the right. Inputs will come in the bottom, scope connections out of the top. The whole board is going into this :

    163FF5AB-7602-4683-8AA5-F3C4E4AAE287.jpeg.12918b8204e874d4007753211bfcee7b.jpeg.ec12962876281100530ea5412fa94c48.jpeg

     

    This construct is going to be floor mounted, next to the pier. I toyed with getting a metal enclosure, but I wanted a clear door. The ‘locks’ can be swapped to proper keyed ones, but as it’s plastic I’m not sure if it’s worth it 

    • Like 1
  8. Network!

    IMG_2141.thumb.JPG.035d14e4bdcc39799e1840b7bd8c1a5e.JPG
    IMG_2144.thumb.JPG.ff49903f2da2e68f8799c4aebce29541.JPG
    IMG_2143.thumb.JPG.dc5e84d5072924cb55d1b93efda72de1.JPG

    A step closer, the wiring in of the CAT6 SWA network cable. It seems a long time since I was laying this underground, but now : 1Gbps connection straight to the broadband hub!

    So this is the official 'first post' from the observatory itself!

    • Like 2
  9. Back on the subject of rails: if I were back at the planning stage, I'd be looking at linear guide rails (C-rails) instead of V / C grooved. The guide rails have the advantages of making the roof 'captive', along with being able to keep the rail on the outside so removing the water ingress problem. Looks a little more expensive, but it does remove the need for hold-down clamps and any engineering of your own captive system

    • Like 2
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. By using this site, you agree to our Terms of Use.