some up dates, finished modifying the cell today and setting the edge support supports. c.o.g. on the mirror should be 26.58 got it to 27mm close, also made a retaining structure with clips to hold the mirror in transit. fitted all mirror box clamps and bolted bearings on properly. just need to thread lock the cell up,paint the whiffle tree edge supports and fit, then complete the uta, which wont take long ,then on to wires . some pics now
first cell before
after
this is the air gap, the black thing on the wood is to make up the height, so that its the same thickness as the mirror 57mm, note the ptfe washers £19 for 4
c.o.g. there is a name for it, but tired now, sure steve or damien will be along soon. close to spec
and how the garage looks now, nice when the stock pile starts to slim