Jump to content

Banner.jpg.b89429c566825f6ab32bcafbada449c9.jpg

Pier Build


dazza1639

Recommended Posts

The bad weather is my fault guys. I've just picked up the pier plates to finish off the pier. As soon as I bolted them down levelled them and mounted the Orbit wedge down came the rain. I don't suppose that having some ADM MDS Rings, Camera Bracket and Counter Weights delivered from FLO helped either. I'll post some finished setup pics if it ever stops raining.

Sorry about the clouds

Darren

Link to comment
Share on other sites

The pier pipe is a 160mm Ø pvc underground drainage pipe from Tool Station.

The pier is currently to tall as I oversized it so that when I build the observatory over it the floor level should give me a comfortable viewing height while still having a clear view of polaris over the house and warm room. To determin this I just drew it out in CAD. If it ends up still being to big its always easier to cut concrete down than add more to it if its too short. If I did it again I would probably go for a 225Ø pipe at this length as I can induce a bit of vibration if I strike it. If it beomes a problem I will just get some 300Ø or 450Ø pvc manhole rings place them over the pier & foundations and fill them with concrete.

Regards

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. By using this site, you agree to our Terms of Use.