  1. Awesome progress James! Mesh was today's job for me too, I used this stuff between my concrete corners. Ground clearance is such that 300mm did for the widest part and 200 mm for the rest.
  2. This weekend's progress wasn't massive, but all the cladding is now finished, including a minimum of 2 coats of paint. Following that, I've fitted the supporting batons for the floor insulation (75mm polystyrene), trial fitted some of the wall insulation (50mm foiled PIR) and installed the rodent mesh around the perimeter (300mm stainless). All slightly fussy jobs, that take up time with little to show, however, since everything for the inside sheeting and flooring is 'on-site', I'm hoping to hit a few meatier jobs in the very near future
  3. I'm really please with now the adapter has turned out, thanks everyone! It's stainless steel offcut plates, 50mm stud connectors as the spacers, hex cap head bolts all from ebay and then AVX adapter from Altair. All stainless except the aluminum adapter It only sign it's from offcuts is both plate have a tiny 3 or 4 mm slot in one edge where the cutting would have started - this is before it has been polished up a bit The knob is quite close, but I'm hoping not to have to mess with it too much once it's installed. If it is a problem I have a shorter replacement I made up from back when I needed to use the polarscope...somewhere ?
  4. Today saw 2 significant events, power and pier The observatory now has power all connected up and live. A couple of sockets in initially, with more to come. A lighting circuit too, waiting for lights ? Out from the main panel in the garage: and into the obs Also the pier head gets its first assembly now all the bits have been machined up: I think I better order the insulation and flooring, things are moving forward!
  5. With Christmas out of the way, things can resume a little: All the remaining cladding is now pre-treated and waiting on a free & dry day. That will be a massive landmark event! The minor water ingress problem seems to have been delt with - The rain was tracking back in along the exposed rails. A dam of silicon on the rail, under the rolling roof but outside the scope room has done the trick, tested in drizzle, now waiting on a downpour haha Big event this weekend should be POWER! An electrician mate is coming on Sunday to joint everything and plumb it in! The list doesn't seem to shrink: Guttering (arriving tomorrow, I think) Perimeter mesh Window Door Insulation Flooring Internal walls Vents Network ...
  6. Yes, essentially working as a pipe. Might be clear tomorrow, so I’m on for investigating
  7. It might also run under the V, if it has access.
  8. In this constant drizzle, I’m seeing water tracking under the rail from the exposed side into the scope side. I’m thinking of solutions at the moment. I’m wondering if a notch under the rail at the transition might interrupt its route Need a dry spell to investigate properly, but it’s only dripping slowly, and I’ve no floor yet.
  9. Thanks Alan. I have the door waiting, it's vertical T&G too, although narrower boards. I'm hoping it'll look like I planned to do it ?
  10. It's spreading! and yes, that is 'sunshine'. You might need to google it ?
  11. I was thinking similar thoughts as cold water dripped down my neck whilst doing some cladding. It was a way further down the list, but might just jump up in priority
  12. Dry inside too! I was so chuffed this morning when I went to check it
  13. Yesterday I thought it might get blown or washed away! My Dad has volunteered to carry on whilst I’m at work this week ??
  14. Thanks James! Did well with the weather, for once ?
  15. Now the roof is coated, the rails needed to go back on for a final fix. This is where we found out just how hard it is to dead lift to rolling roof! Rails fixed, over centre catches added and a bit of a tidy Cladding begins on Sunday, if the forecast is to be believed ?
  16. Even with land drains, its not fantastically well drained - A dusting of tops soil over boulder clay. The curse of the new(ish) build!. It has had above and beyond the level of traffic it might cope with. I'll be making a path and step, and the rest will bounce back I'm sure ?
  17. Status update: the roof is waterproofed, although not in its finished state. It needs a top coat to smooth it over, but it’s not idea at this time of year, so it’s a job for next year now. The rails need to go back on once the coating has cured (next weekend) So, with the roof pretty much ticked off, I’ve put up the membrane ready for cladding. Daylight photos! (Yes, it’s a swamp!)
  18. If it helps, I found an 800 x 800mm unused unit on eBay : £1.30! It didn’t seem an uncommon thing
  19. First day of liquid coating onto the rolling roof, so of course we have torrential rain tonight. Still, it is moisture cured ? Pics when there’s daylight
  20. I went with these in 50mm lost head 2.65mm, but they do a selection: https://www.silvatimber.co.uk/fasteners/stainless-steel-annular-ring-nails.html
  21. Looks amazing! The plate over the lock is called an ‘anti thrust plate’ if you want to look them up
  22. Thanks! That coating is the vapour barrier, applied with what is basically contact adhesive. Next is the liquid coating with glass fibre mat imbedded. Followed by the mid grey top coat. Im looking forward to the cladding too. It’ll suddenly be a building
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. By using this site, you agree to our Terms of Use.