  1. Another 2 test shots from the observatory, dating to August 9 and 10. NGC884-869, The Double Cluster (5 hrs 25 min in 5 min subs) and M13, Globular Cluster (3 hrs 15 min in 5 min subs), shot with the Altair Astro Hypercam 269C Pro TEC (gain 565, offset 25, @ -10°C), calibrated with 50 flats and 48 darks, processed in PI. 8 inch Newton/MPCC mkII/8x50 QHY5 finder guider on NEQ6.

    NGC889_869_LinFit_DBE_ATrousWavNR_HisTrans_ABE_CurvSAT.jpg.0721dd480f9ffb9fbd7c3776e4d6beef.jpg

    M13_LinFit_DBE_ATrousWavNR_HistTrans_CurvSAT.jpg.9e2f1f57c6c265347add656d486c4739.jpg

    • Like 12
  2. OK the first serious testing has commenced, trying to get familiar with my old and new kit and also with processing astro imaging data. This image was shot on 4 clear nights between Septemebr 19th and 23rd and consists of almost 18.5 hours of data (369x 3 min, -10°Cm gain 5.62, offset 25) shot with the AA Hypercam 269C Pro TEC, calibrated with 50 darks, 21 flats and 50 bias frames and stacked in DSS, postprocessed in PI. Still need to relearn a lot in PI, but for now I am happy with my first image in about 5 years time. Also, this test shows there is quite a lot possible even under my Bortle 5-6 skies.

    VdB141_2020.jpg.8e7cdc45311cfb2efb6c9a1af3cf05cd.jpg

    • Like 11
  3. OK the first serious testing has commenced, trying to get familiar with my old and new kit and also with processing astro imaging data. This image was shot on 4 clear nights between Septemebr 19th and 23rd and consists of almost 18.5 hours of data (369x 3 min, -10°Cm gain 5.62, offset 25) shot with the AA Hypercam 269C Pro TEC, calibrated with 50 darks, 21 flats and 50 bias frames and stacked in DSS, postprocessed in PI. Still need to relearn a lot in PI, but for now I am happy with my first image in about 5 years time. Also, this test shows there is quite a lot possible even under my Bortle 5-6 skies.

    VdB141_2020.jpg.31446788f24bba692d8bc2ab622996ec.jpg

    • Like 4
  4. First light approaches..........

    All equipment is placed and hooked up to power and data cables.

    IMG_1543.JPG.a57dbb18d438db95fe25f0d96a7994a1.JPG

    Cable management, nice and tidy. Biggest challenge was placing the PSU for the Hypercam, which is VELCROed to the back end of the OTA dove tail.

     

    IMG_1545.JPG.e0d8edfd84e8e487aa09a0af5370a37c.JPG

    Mission control, although on most nights this will be monitored from inside my warm house.

     

    IMG_1546.JPG.ea108d0b9423fb9ea94d2c8d1c4e3cf9.JPG

    Back side of the center console with mains suply.

     

    Daylight testing; Slewing to Regulus.

     

    Custom parking for roof clearance when closing the Observatory.

     

    SGL Arduino focuser installed and up and running again.

  5. And then there was power and light.

    IMG_1513.JPG.be20dd16b6cf8437ec5b5550e3b6efde.JPG

    3x 2 powersockets installed and hooked up to mains, further distribution will be done by extention leads.

     

    IMG_1511.JPG.39758cd80c2a4f4a34b25c5c7afd0879.JPG

    Bright white.

     

    IMG_1515.JPG.499f4fe95977cd4c945c30366d53dee4.JPG

    Bright red. Sadly a single red LED in the 2nd strip is defect.

     

    IMG_1514.JPG.484230b83dc200c84a03a627690a2f52.JPG

    Dim red.

     

    Now if only the neighbors won't start getting weird ideas what's going on when the red light is on in the obsy at night........;-)

    • Like 1
  6. Lots of small things to work on currently.

    IMG_1496.JPG.c67466fe3223e7c54e8550456d54c404.JPG

    North pier side console, holding 2 sockets and a main power switch to disconnect all equipment from mains.

    IMG_1497.JPG.e0bcbe6b481d1fbd7120bf15c882f762.JPG

    South pier side console, holding the control PC

    IMG_1500.JPG.f9698a99f10332430a262e70f7a7c69b.JPGIMG_1501.JPG.ea2bfcf4c4d6c187556a37964301e19f.JPG

    Roof insulated and finished with some 3 mm ply wood.

    IMG_1504.JPG.9e9be39da4ac30852d7ae8bae4b3d749.JPG

    Remaining opnings at the front of the roof closed off with brushes.

    IMG_1507.JPG.41df22e0436da7544c86686f01abfb2b.JPGIMG_1510.JPG.b085ca645f22b5a3ce0b0d0e1b346d3d.JPG

    Same at the back end.

    IMG_1506.JPG.509cd96aab23043df96c3e95e2eb2d2b.JPG

    Added an additional layer of aluminium to raise the wheels by about 2 mm to resolve an issue with the side of the L-profile cutting into the rollers at some spots.

     

    • Like 1
  7. You are absolutely right Andrew, I just realised this potential issue recently, and had not thought that it may pose an issue on damp nights, when condesation could occur on the roof, which could then end up in the observatory. It has however a gutter installed already, which moves with the roof opening. However, a small design flaw is, that I should have made it wider so it drains besides the wall. I will probably circumvent the potential issue that this may cause on damp nights, by plugging/unplugging the draining hole when I open/close the roof.

     

  8. Another joyfull day of working under sunny skies on the Obsy.

    IMG_1482.JPG.c0b5f569e3cb37d70823718d763fed88.JPG

    Finished the frame for the raised floor, half of which will be fixed, and the other half will be removable. The frame will serve for visual observing and more easy acces to the equipment for maintenance and adjustments.

    IMG_1483.JPG.b7e074078572c42156231ed7a00e76e6.JPG

    Little stair case to raised floor.

    IMG_1484.JPG.1ad03867f66971d802e696db88db8e21.JPG

    Also received a new piece of kit today, so sorry for the clouds.

     

     

    • Like 9
  9. Did a lot of work, together with my dad, on getting the power and data connections installed. Not completely done, but all cables are in placed, mains ready for connecting to sockets when they are installed in the obsy, data cable in place in the conduit as well.

    IMG_1475.JPG.e66844941cee0a9f02de8215705be6b2.JPG

    Data cable originating from router on the other side of the wall. Also shows mains splitting from power of my house shed.

     

    IMG_1476.JPG.0a86798f04875163105805fddc3c959e.JPG

    Added additonal spare socket to the shed as well, and installed ethernet switch for connecting to the obsy. Main power supply going towards obsy going out at the bottom.

     

    IMG_1477.JPG.a30000cd0867256583756eaccc4b316a.JPG

    Mains and data connection runnig thru the 2 inch conduit (15 m) towards obsy.

     

    IMG_1478.JPG.380c69c19fc11edd1dd1399dd2d6d812.JPG

    After 15 m, the conduit goes underground for another 6-7 m to surface next to the pilar.

     

    IMG_1479.JPG.d0795a2069525336c73692b4c693f24e.JPG

    Also started work on the a partly removable raised floor for visual observing (and more easy maintenance as well), half of this florr will be permanent, the other half will be removable, and only be put into place when needed.

    • Like 1
  10. After having to put astronomy on hold for over 2 years due to dealing with a divorce and moving houses because of that, I finally got started with getting back into astrophotography again. Sadly, I had to abandon my balcony observatory (LOMO) as well, and with it that also my great views.

     

    This first post will show a summary of my build progress that took place between April 18 and May 27 2020.

    1164907784_Bruintingerbrink_stitchAnno.thumb.jpg.3ebd856482a6c53868f03916b548593d.jpg

    My new place doesn't have the best of views, but we will just play with what we have. (sorry about Dutch annotation).

     

    IMG_1328.JPG.ac98aedaa6a3c277f54ddfc546ecf1b2.JPG

    View of the backyard before construction started, the obsy will be build on the right side in the picture, as this will give me the most clear views around.

     

    IMG_1422.JPG.1b74cedf57ad7f9132c8d06b4d6da4da.JPG

    Cleared the vegetation and removed the artificial grass.

     

    IMG_1426.JPG.7937b4ab329bdcdca42625274219fa98.JPG

    Outlined the dimensions, and preparation for pouring the concrete pier foundation.

     

    IMG_1431.JPG.2a89bd5da9e43fc953746700f6fc8dd5.JPG

    Trying to strike Oil........ but with the low Oil prices due to Covid pandemic, I decided to just use the hole for the pier foundation anyways.

     

    IMG_1433.JPG.65cef6d329f951e7b93f4bf885f0486e.JPG

    Ready for pouring concrete, hole is 50x50 cm and about 75 cm deep.

     

    IMG_1436.JPG.2d2bfacb10d0e02583f6da0e479e836f.JPG

    Almost 400 kg of concrete later.......

     

    IMG_1439.JPG.fa3452e4e6702b4d070f676c029fa0ee.JPG

    Waiting for concrete to settle during the week.

     

    IMG_1442.JPG.d6cee30dd6504b4794fa9cddebae1b13.JPG

    Adapters to hold the floor frame. Frame will be placed on 12 of these.

     

    IMG_1443.JPG.06c39b47bbf6a12f1a3c23bd3775d658.JPG

    Floor frame.

     

    IMG_1444.JPG.9cc2eb5e08d4f161eb07997eddb9e42a.JPG

    Lots of wood in a small shed........

     

    IMG_1445.JPG.3220bf47460548e96b8040683ec27ae0.JPG

    Floor frame concreted in place.

     

    IMG_1446.JPG.fccff4aa76298f5e524a2f89b2a98acb.JPG

    Wall frames placed.

     

    IMG_1450.JPG.19b6cf33b05bc41f837967a0f60899d3.JPG

    Roll off roof frame placed.

     

    IMG_1451.JPG.d5706f0bd6e793c5ca1c6b83e5ec48a7.JPG

    Lock down installed (and not for Covid in this case).

     

    IMG_1452.JPG.2642e5046f4f731bdc98b259ed85e552.JPG

    Damp open membrane placed.

     

    IMG_1453.JPG.abbfe0a219f8347e43e71e5e7db07e9d.JPG

    Shiplap applied to South/West/North walls.

     

    IMG_1456.JPG.30f5001dd690aac524f1d80aa7758ef5.JPG

    Door crafted and shiplap applied to East wall.

     

    IMG_1457.JPG.cb21ff8209b03820b52f684491b9f969.JPG

    Roof plated and shiplap applied.

     

    IMG_1460.JPG.bef0980352f30970798ea3c481a6ccbb.JPGIMG_1461.JPG.12e41bd735c160d32baf6b2b04a23f74.JPG

    Guttering and roof trim applied.

     

    IMG_1462.JPG.c1744ceaf876301523c4bcce5b752ce3.JPG

    Finished underside.

     

    IMG_1465.JPG.751e2fc7a53a3b4e618aa0a4269c033b.JPG

    Electrical/Data cable preparation.

     

    IMG_1466.JPG.1eba2b85d6159a17f31e17f85ec0af4c.JPG

    OSB flooring.

     

    IMG_1468.JPG.6995aed6778fb6132ebeb76bf657d8bd.JPGIMG_1470.JPG.2204b7379e783673e36ce589959f312e.JPG

    Wall insulation, finished with meranti plywood (kinda looks a bit like storm clouds on Jupiter). Aluminium profile to hold LED lighting strip.

     

    IMG_1471.JPG.fc03f5f727978f72ba74d313b64b73d4.JPG

    Finishing touches to wall top sides.

     

    IMG_1473.JPG.01b60020c01ea719481d09b5c970ff3b.JPG

    First piece of kit to go in; PC monitors on the wall.

     

    IMG_1474.JPG.3b1f7a6cbf5d65f71261e9c2f5291a25.JPG

    Added some pipe insulation to act as wind barrier on the roof trim.

     

     

    • Like 13
×
×