Jump to content

Banner.jpg.b83b14cd4142fe10848741bb2a14c66b.jpg

My second observatory build starts.


ItsmeMaw

Recommended Posts

And I hope this is the last!

8' x 12' with 8'x8' for my 8" reflector on the recently purchased EQ6.

The back 4' will be an area for the eyepieces and eventually setting up the laptop.

The building sits on 6 pads that are a cubic foot of high strength concrete with steel reinforcement. 

The pad for the scope is 18" x 18" x 12" with steel.

Being I'm in Florida, I dont expect any problem with the ground freezing!😁

So, now that I'm quarantining I've been busy with it.inbound6754972092725428822.thumb.jpg.16c1360e8a9f6820403bfc4bed577629.jpginbound1983180861641221173.thumb.jpg.242a35ab9e2ac91cbbb291e01db7972e.jpginbound3337259093336837438.thumb.jpg.107a7f3e1e07d7222644c10baf7c2a15.jpg

The floor floats above the pier pad and doesn't touch it. I reused as much of the first observatory structure as I could salvage, that why some deck is painted and some not.

The concrete block pier is poured solid with steel in it.

If all goes well, I hope the walls are finished tomorrow. Along with the back room.

And thanks to the Covid lumber is outrageous! But just a month ago it was even higher priced!

  • Like 4
Link to comment
Share on other sites

  • 2 months later...
  • 2 months later...

Still some odds and ends, but I'm much closer. 

This past week I insulated it, it will take 1 more roll.

Also got electricity in it for thr refurbished computer my #1 daughter gave me for Xmas. 

Lots of cleaning up from this build and the demolition of the old observatory.  I discreetly kept the mess out of the images.20220422_140947.thumb.jpg.05f56190ea754d201de16aaeec1b41a6.jpg20220422_140640.thumb.jpg.1c11db5f41a6a01c34f55a11e051ef72.jpg20220422_140307.thumb.jpg.7e3add374938e33b54465f820e383ce6.jpg20220422_140523.thumb.jpg.f9d005e83d9b0856f30adf9ddfbb6011.jpg20220422_140341.thumb.jpg.d704a28aa908c74646a605790500df10.jpg

  • Like 3
Link to comment
Share on other sites

  • 2 months later...

Working on the final details, the inspectors are really demanding!

20220629_184705.thumb.jpg.b4c0a5404f9685288cf7910e4b93ba39.jpg

Installing some insulated curtains trying to cut down on the heat in the "warm/dry" room. I'm planning on some wall venting this area to help circulate more air. It hits 115° F some days!

20220629_185054.thumb.jpg.0dcd321bbe5874db048289af0abbeb4f.jpg

20220629_185136.thumb.jpg.c06efab21e92cfc546c3d5ebea7f14d4.jpg

Small fan running helps. Maybe on a thermostat?

Computer went out there today too.

20220629_185109.thumb.jpg.cabd44faa0a2d245543537a6bda4d298.jpg

  • Like 5
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue. By using this site, you agree to our Terms of Use.